How will the GAM be integrated into OCHA systems like OPS and GMS?

A:  OCHA HQ is currently finalizing this and will be circulating this information shortly.  The GAM for project design is required for any projects submitted, independent of OCHA systems.  GAM records will be stored on the GAM database and uploaded to OCHA as soon as the interface between systems is operational (likely end of 2018.)

In the meantime, countries can adapt the OPS drop down box where the old Gender Marker Code was entered (0-1-2A-2B) to read 0-1-2-3-4 (M or T), to reflect the new GAM coding.     A more detailed procedures note is coming soon.